Manufacturing IT Architecture|Decide responsibilities and data flows before choosing products
What you get: In about 8–16 weeks (12 weeks typical), you decide which system owns the “master” for what, and management can decide the order of investments.
PLM, SAP S/4HANA, MES, SCM. The systems are in place, yet engineering changes never reach the plant, inventory figures do not match and management numbers arrive late. The cause is usually not product functionality but that no one has decided which system owns what, and which data is handed over when.
Paddy & Water draws the overall architecture in terms of business responsibilities and data flows, not product names, and turns it into an investment sequence management can decide on.
Does this sound familiar?
- You are considering an ERP renewal or MES/PLM implementation but cannot decide where to start
- Product comparisons and proposals pile up, but your own priorities are unclear
- Concept work drags on and has been “under review” for years
- Engineering change, supply-demand, production and cost figures disagree between systems
- Department-by-department systems keep multiplying, and integration costs and incidents are growing
Why the overall architecture comes first
Starting from products vs. starting from the overall architecture
| Aspect | Starting from products | Starting from the overall architecture |
|---|---|---|
| Starting point | Feature and proposal comparisons | Division of business responsibility and where each “master” lives |
| Engineering change | PLM and ERP linked one way only | Flow from E-BOM to M-BOM, routings and quality, including feedback from the shop floor (closed loop) |
| Supply and inventory | Planning and execution optimized separately | Planning granularity, replanning conditions and who decides allocation and order promising are defined |
| Cost and KPIs | Re-aggregated every month | Collection units for actuals and ownership of variance analysis are defined for fast, correct numbers |
| Master data and integration | Cleaned up just before migration | Master ownership, change approval, error monitoring and resend responsibility defined first |
| Investment decisions | Separate approval per product | One roadmap explains sequence and benefits |
Scope of support
Durations are general guidelines and vary with scope and number of sites. Implementation of engineering-change flows is covered by “ECM×SCM Integration,” and recovery of an ongoing SAP project by “SAP Implementation & Recovery.”
How it works
- Free consultation:We hear the themes under consideration and your current landscape, and agree the assessment scope.
- Understand the current state:We review architecture diagrams, master data, process flows and issues through documents and interviews.
- Identify the breaks:We pinpoint where and why problems occur along data flows and responsibility boundaries.
- Architecture and roadmap:We compile the target architecture, responsibility split and phased plan and report to management.
- Support into execution:We support product selection, RFPs and team setup through project kickoff.
Deliverables
| Deliverable | Contents |
|---|---|
| Current-state assessment report | Current architecture, breaks and risks, priority issues to confirm |
| Architecture diagram and responsibility matrix | System roles, master data ownership, list of boundary decisions |
| Data flow design | Timing, confirmation conditions and exception owners for six key flows |
| Roadmap | Phasing, expected benefits, cost logic, proposed organization |
| Selection criteria (if needed) | Evaluation criteria based on your requirements and a draft RFP |
Track record (anonymized under confidentiality)
| Industry / situation | Issue | What we did | Outcome |
|---|---|---|---|
| Engineering conglomerate|Even with several consultancies involved, concept work was unfinished after two years | Issues and decision materials were never consolidated, so no agreement could be reached | Reworked scope, roadmap and cost-benefit, and defined a plan to dismantle large legacy systems and a future data platform | Rapid agreement with the executive team |
| Manufacturer|Considering MES while each plant tracked actuals on paper, Excel or local systems | Differences in plant processes and data, and the split of roles between ERP, PLM and MES, were not organized | Current-state assessment through shop-floor interviews, responsibility split, and phased implementation measures | Scope, priorities and roadmap presented in a form management could decide on |
Client voice
“A year ago we had no vendor and could not see the tasks. Since P&W joined, we have been able to take proposals to the board and we understand the project’s progress far better.”
— Managing Director, engineering company (anonymized, published with permission)
Why work with Paddy & Water
- End to end from PLM to MES:With engineering change (ECM) and supply chain (SCM) at the core, we have designed PLM–ERP–MES–SCM boundaries in practice
- Architecture from requirements:SAP expertise is our strength, but the architecture is decided by business and data responsibilities, comparing other products where needed. When we support product selection, we disclose all criteria and results
- Beyond the concept:We support product selection, RFPs and team setup to put the roadmap into action
FAQ
- Q. Can we consult you even without concrete implementation plans?
- A. Yes. Consulting before implementation actually makes it easier to avoid detours and double investment.
- Q. Do you assume a particular product such as SAP?
- A. SAP expertise is our strength, but the architecture is decided by business and data responsibilities. When supporting comparison or selection, we disclose the criteria and results so you can decide.
- Q. Can you evaluate proposals from our current integrator or consultants?
- A. Yes. We offer second opinions that check proposals for gaps and risks from the perspective of overall architecture and responsibility split.
Paddy & Water service portfolio
Our services follow “concept → execution → operations,” plus four specialist assessments. Start from whichever stage you need now.
| Stage | Service | Purpose |
|---|---|---|
| Concept | Manufacturing IT Architecture (this page) | Decide the company-wide system landscape and investment sequence |
| Execution | SAP Implementation & Recovery | Move SAP projects forward from the client side |
| Execution | ECM×SCM Integration | Connect engineering change and supply planning/order promising (e.g. SAP IBP, Advanced ATP) to procurement, production and inventory |
| Operations | SAP Operations & Maintenance | Stabilize SAP after go-live and keep improving |
| Operations | IT Staff Outsourcing | Handle IT department work and planning as one |
| Specialist assessment | GxP Compliance Assessment | Be able to prove compliance to overseas customers and regulators |
| Specialist assessment | AI Adoption Assessment | Put AI to work where it pays off |
| Specialist assessment | SAP FUE Optimization Assessment | Right-size SAP license costs to actual use |
| Specialist assessment | Manufacturing Cybersecurity Assessment | Close the paths that could stop plants and core systems |
Related knowledge
- What is a BOM? E-BOM and M-BOM basics
- ECM×PLM: implementing engineering change management
- What is MES? Major products and selection criteria
- What is PLM? Comparing major PLM systems
- ERP investment decisions and governance
- Master data management and data governance
Let’s find your “breaks” together first.
Tell us about your current landscape and the themes under consideration, and we will propose an assessment scope. Initial consultation is free and online.