Executive summary (for CEOs, CFOs and CIOs; updated November 2026)
- Mainstream maintenance for SAP ECC (Business Suite 7) ends at the end of 2027. Even with extended maintenance (2028–2030, +2 percentage points on maintenance fees), on-premises ECC can in principle be used only until the end of 2030
- Using it from 2031 requires the “transition option” (2031–2033), which presupposes a RISE with SAP contract. Terms and costs are negotiated individually; it buys time rather than removing the need to migrate
- The real executive decision is not the deadline but (1) commitment to adopt standard processes, (2) clean core (limiting custom code), (3) securing people and partners, and (4) explaining return on investment. Working backwards, large companies realistically need to set direction during 2026–2027
The “SAP 2027 problem” has changed shape since SAP announced extensions in 2020. There are now three milestones: 2027 (end of mainstream maintenance), 2030 (end of extended maintenance) and 2033 (end of the transition option). This guide explains what each means, the conditions, and the issues executives must decide.
What you will learn
- The three milestones — 2027, 2030 and 2033 — and their conditions
- How to think about the cost of extended maintenance and the transition option
- What clean core is and why it is an executive issue
- Issues to confirm before deciding, and a backward-planned schedule
1. Three milestones
| Deadline | What ends | Conditions and notes |
|---|---|---|
| 31 December 2027 | Mainstream maintenance for SAP Business Suite 7 (ECC 6.0 EHP6–8, etc.) | New deliveries such as legal changes are then limited to extended maintenance customers |
| 31 December 2030 | Extended maintenance (2028–2030) | Extended maintenance adds 2 percentage points to maintenance fees. ECC on non-HANA databases is also reported to lose support at the end of 2030 |
| 31 December 2033 | “SAP ERP, private edition, transition option” (2031–2033) | Requires a RISE with SAP contract; does not apply to self-operated on-prem ECC. Confirm terms and costs individually with SAP |
Note: SAP’s maintenance policy has changed before, and conditions (discounts, uplift rates, eligibility) can differ by contract timing. Always confirm your contract terms and the latest official information with SAP or partners. Third-party maintenance is also an option, but evaluate it together with legal-change support, security and the difficulty of a later migration.
2. The cost of waiting
- Rising maintenance cost: the extended maintenance uplift plus growing infrastructure and security costs for an aging platform
- Competition for talent: as deadlines approach, experienced consultants and integrators become harder to secure and more expensive
- Opportunity cost: most AI (SAP Joule, Business AI) and new functions require S/4HANA or cloud and are not available on ECC
- Slower management data: legacy, customization-heavy systems slow global visibility of numbers and response to new requirements such as environmental data
3. Clean core: why it is an executive issue
SAP strongly promotes “clean core”: leave standard functions untouched and extend only through defined methods (APIs, BTP, etc.). In 2025 SAP also introduced a four-level (A–D) view of how “clean” extensions are.
- The more custom code, the higher the migration cost, testing effort and future upgrade burden
- Reducing custom code requires a decision to adopt standard processes — something only executives, not the shop floor, can make
- A migration that “reproduces current processes” may look safe but repeats the same problem at the next upgrade
4. Issues executives should confirm
- Purpose: technical upgrade to avoid end of support, or business transformation? The purpose determines the approach (brownfield, greenfield, selective)
- Return on investment: can you explain value beyond cost reduction — faster decisions, global standardization, regulatory response (environmental data, internal control)? See ERP Investment Decisions and Governance
- Contract model: RISE with SAP (cloud) or on-prem; whether you need the transition option to 2033
- Organization: can you secure key business and IT people? Who leads the Center of Excellence?
- Surrounding systems: alignment with renewal plans for PLM, MES, WMS, BI and other connected systems
5. Backward-planned schedule (typical for large companies)
| Phase | Typical duration | Content |
|---|---|---|
| Vision and decision | 3–6 months | Purpose, scope, approach, budget, organization |
| Partner selection and planning | 3–6 months | RFP, contracting, detailed plan |
| Design, build, test | 12–24 months | Varies greatly by scale, approach and number of sites |
| Rollout (multi-site) | 6–24 months | Phased rollout by site |
Working backwards, finishing a multi-site migration by the end of 2030 makes a decision during 2026–2027 the realistic limit. If later, you will need to consider “buying time” — the transition option (RISE-based) or third-party maintenance — together with a migration plan.
Summary
SAP’s maintenance deadlines now come in three stages, so systems will not “stop” suddenly. But extended deadlines do not remove the need to migrate, and the longer you wait, the tighter cost and talent constraints become. Deciding early on purpose, standardization, ROI and organization is the most reliable risk mitigation.
Talk to us about your SAP migration decision
For help clarifying migration purpose, approach and budget, clean core policy or partner selection, please reach out via our contact page.