EU GMP Annex 11 (“Computerised Systems”) sets out what is expected of computerised systems used in GMP-regulated activities in Europe. The same text is incorporated into the PIC/S GMP Guide, so it is referenced in inspections not only in Europe but across PIC/S member countries, including Japan. This introductory guide covers the structure of the current (2011) version and the key point of each clause, how it differs from 21 CFR Part 11, the revision draft published in 2025 together with the new Annex 22 on artificial intelligence, and what to start preparing now.
What you will learn
- Where Annex 11 sits, and its relationship to PIC/S and Japan
- The structure of the current version (principle, general, project phase, operational phase) and each clause
- How it differs from 21 CFR Part 11
- What the 2025 revision draft would change, and what Annex 22 (AI) is
- Points to watch with ERP and cloud, and what to prepare now
1. What Annex 11 is
Annex 11 is one of the annexes to the EU GMP Guidelines (EudraLex Volume 4). The current version was revised in 2011 and has applied since 30 June 2011. It sets requirements for computerised systems used in GMP activities, covering risk management, validation, data handling, audit trails, security, electronic signatures and more.
The PIC/S GMP Guide contains an Annex 11 with the same content. Japan joined PIC/S in 2014, and domestic inspections now apply the PIC/S GMP lens. As a result, Annex 11 is a practical benchmark even for companies that do not export to Europe.
The difference from Part 11 in one line: Part 11 is a US federal regulation focused on the conditions for treating electronic records and signatures as equivalent to paper; Annex 11 is a European GMP guideline on how to manage computerised systems across their entire lifecycle.
2. Structure and key points of the current version
| Section | Clause | Key point |
|---|---|---|
| Principle | — | Computerised systems should be validated. Replacing a manual operation with a system should not reduce product quality, process control or quality assurance |
| General | 1. Risk management | Apply risk management throughout the lifecycle, considering patient safety, data integrity and product quality; base the extent of validation and data controls on risk |
| 2. Personnel | Process owners, system owners, QA and IT work together, each with appropriate training and responsibilities | |
| 3. Suppliers and service providers | Formal agreements with suppliers of software and services, with clear responsibilities; assess supplier competence and reliability based on risk (including audits) | |
| Project phase | 4. Validation | Cover the full lifecycle. Define user requirements (URS) with traceability through testing; keep an up-to-date system inventory; validate data migration |
| Operational phase | 5. Data | Build in checks for correct and secure data exchange with other systems |
| 6. Accuracy checks | Critical data entered manually should have an additional accuracy check | |
| 7. Data storage | Protect data physically and electronically and keep it readable throughout retention; regular backups with verified restore | |
| 8. Printouts | Clear printed copies of electronic data must be obtainable; for batch release records, printouts should show whether data changed since original entry | |
| 9. Audit trails | Based on risk assessment, audit trails for changes and deletions of GMP-relevant data, with the reason recorded; audit trails available and regularly reviewed | |
| 10. Change and configuration management | Changes to systems made in a controlled manner per defined procedures | |
| 11. Periodic evaluation | Periodically confirm systems remain in a validated state | |
| 12. Security | Physical and logical access controls; record the creation, change and removal of access rights | |
| 13. Incident management | Report and assess incidents such as system failures and data errors; identify root causes for corrective and preventive action | |
| 14. Electronic signature | Same impact as handwritten signatures, permanently linked to the record, including date and time | |
| 15. Batch release | Where used for release, only Qualified Persons can certify batches, with the releasing person clearly identified and recorded | |
| 16. Business continuity | Provisions (alternative arrangements and recovery procedures) to keep critical processes running if a system fails, and these should be verified | |
| 17. Archiving | Check that archived data remains accessible and readable; when systems change, confirm data can still be retrieved |
3. How it differs from 21 CFR Part 11
| EU GMP Annex 11 | 21 CFR Part 11 | |
|---|---|---|
| Issuer | European Commission (EudraLex Volume 4); same content in PIC/S GMP | US FDA (Code of Federal Regulations, Title 21) |
| Nature | Annex to the GMP guidelines | Federal regulation (legally binding) |
| Focus | Lifecycle management of computerised systems | Conditions for treating electronic records and signatures as equivalent to paper |
| Risk | Risk management stated in the first clause | Not explicit in the rule; risk-based thinking set out in the 2003 guidance |
| Supplier management | Explicitly requires assessment of and agreements with suppliers and service providers | No explicit requirement in the rule |
| Operational requirements | Separate clauses for periodic evaluation, incidents, business continuity and archiving | Mostly handled within the §11.10 controls |
| Electronic signatures | Equivalent to handwritten, linked to the record, with date and time | Manifestation, linking and uniqueness, plus certification to FDA |
Systems used across Japan, Europe and the US are typically designed to meet both Part 11’s electronic record and signature requirements and Annex 11’s lifecycle requirements. For Part 11 details, see our 21 CFR Part 11 guide.
4. The revision (2025 draft)
In July 2025 the European Commission published drafts of a revised Chapter 4 (Documentation), a revised Annex 11 and a new Annex 22 (Artificial Intelligence) for consultation, with comments accepted until 7 October 2025.
| Document | Key points of the draft |
|---|---|
| Annex 11 (revised draft) | Expanded substantially, from about five pages to about nineteen. Strengthens quality risk management across the lifecycle and makes expectations more specific on audit trails and their review, access management, security, oversight of external suppliers and service providers including cloud, and periodic review |
| Chapter 4 (revised draft) | Brings data lifecycle and data integrity thinking into documentation and records, both paper and electronic |
| Annex 22 (new draft) | For AI models used in GMP, requires attention to selection, training and validation, change control and ongoing performance monitoring. Generative AI and large language models are positioned as out of scope for critical GMP applications |
Status at the time of writing (November 2026): the drafts drew a large volume of comments worldwide, and we have not been able to confirm publication of a final revised Annex 11 or a final Annex 22. Please check the European Commission’s EudraLex Volume 4 page for the latest status.
The final text may differ from the drafts, but the direction is clear: audit trail review, access management, oversight of outsourced providers (including cloud) and data integrity will be examined more specifically and more strictly. The principles in our data integrity guide are effectively becoming regulatory text.
5. ERP and cloud considerations
- System inventory: include ERP as a system with GMP-relevant functions, and make clear which modules and functions are GMP-relevant
- Supplier assessment (clause 3): for SaaS and cloud, confirm the provider’s quality management, change management, data location, backups and incident response through contracts and assessment; check how provider updates affect your validated state
- Interfaces (clause 5): build checks that detect loss, duplication or alteration where data passes between ERP and MES, LIMS or WMS
- Audit trails (clause 9): confirm change history is retained for GMP-relevant masters and documents, and that a review procedure and frequency are defined
- Batch release (clause 15): if release decisions are made in ERP, restrict approval rights and record the approver and timestamp
- Business continuity (clause 16): have procedures for continuing release decisions and inventory control if ERP goes down
For a detailed ERP validation approach, see GAMP5 × SAP: Validation Design Guide.
6. What to prepare now
- Update the system inventory: identify GMP-relevant systems and classify them by criticality and risk
- Systematize audit trail review: define in procedures which systems and actions are reviewed, when and by whom
- Periodic access reviews: embed recording of grants, changes and removals, plus periodic review, into operations
- Assess outsourced and cloud providers: clarify responsibilities in contracts and quality agreements, and keep assessment records
- Understand AI use: if AI is used or planned in quality-relevant work, document the use case and how it is controlled
Summary
Annex 11 requires computerised systems to be managed across their entire lifecycle — not only validated at implementation, but controlled through operation, change and retirement. Through PIC/S it is also the benchmark in Japanese inspections. The 2025 revision draft signals more specific expectations on audit trails, access management, outsourced providers and AI, so it pays to start preparing without waiting for the final text.
Talk to us about Annex 11 and preparing for the revision
For help organizing your system inventory, building audit trail review and access management, or assessing cloud providers, please reach out via our contact page.